Echo House 瑜悅
URA Development Project SSP-015 at NKIL No. 6627 Tonkin Street and Fuk Wing Street, Sham Shui Po, Kowloon
Project information
The Site of the Works is located at Kowloon Inland Lot No. 6627.
The Works comprises the construction of a 32-storeys residential tower with one level basement. Concrete MIC system will be adopted.
Client
Urban Renewal Authority
Start/Completion
2024

No. 2C-2D Boundary Street
Composite Re-development at 2C-2D Boundary Street, Mongkok, Kowloon
Project information
The project is to propose composite re-development at 2C-2D Boundary Street, Hong Kong with demolition of existing 5 storeys pre-1950 residential buildings and redevelop the site into a new building for commercial and residential use without basement. The building is to be 26-storeys reinforced concrete residential building with a total height of 91.35m and 4 roof floors.
Client
Joyful Land Development Limited
Start/Completion
2025

Redevelopment of 20 Storey Residential Building with Basement at No.2, San Lau Street
Project information
The project is comprising of redevelopment of residential building at No 2, San Lau Street. Two existing buildings were demolished for the redevelopment of Residential Building. The new building is to be 21-storeys reinforced concrete building with a total height of 91m with 5 roof floors and no Basement.
Client
New Brilliant Development (Holdings) Limited
Start/Completion
2025

MTR Tung Chung Traction Substation Property Development at TCTL No. 50
Project information
The project of Tung Chung Traction Substation Property Development (TCTL 50) is for the user of private residential, government accommodation and railway purposes with about 2000 no. of residential units at "R(A)8" under the approved Tung Chung Town Centre Area Outline Zoning Plan No. S/I-TCTC/24, site area About 14,548 m2, the residential. Concrete MIC system will be adopted.
Client
Chinachem Group
Start/Completion
Ongoing


Light Public Housing at Yau Pok Road, Yuen Long, at Tuen Mun Area 3A and at Choi Hing Road, Ngau Tau Kok
Project information
Light Public Housing (“LPH”) and ancillary facilities at three sites, located at Yau Pok Road, Yuen Long (“Yau Pok Road site” or “YPR”); Tuen Mun Area 3A (“Tuen Mun 3A site” or “TM3A”); and Choi Hing Road, Ngau Tau Kok (“Choi Hing Road site” or “CHR”).
Client
Architectural Services Department
Start/Completion
2026

Light Public Housing at Ma On Shan & 5 Vacant Schools
(SSN 516)
Project information
Light Public Housing (LPH) and ancillary facilities at Hang Kwong Street, Ma On Shan; and design and conversion for Light Public Housing (LPH) and ancillary facilities at five vacant school premises (5VSPs), for the Housing Bureau (HB).
The Site is located at:-
(1) Hang Kwong Street, Ma On Shan (MOS site);
(2) Former St. Joseph’s Anglo-Chinese School (St. Joseph site);
(3) The Mission Covenant Church Holm Glad No.2 Primary School (Holm Glad site);
(4) TWGHS Ma Kam Chan Memorial Primary School (Choi Yuen Annex) (MKC site);
(5) Carmel Leung Sing Tak School (Carmel site);
(6) Baptist Rainbow Primary School (Rainbow site).
Client
Architectural Services Department
Start/Completion
Ongoing

Chung Yuet Lau (松悅樓)
Elderly's Home at Jat Min Chuen Chung Yuet Lau
Project information
The 1st MiC Project for Housing Society. The ground floor and the 1st floor will construct with traditional reinforced concrete while the 2nd to 9th floor will build a steel structure MiC building.
Client
Hong Kong Housing Society
Start/Completion
2024

LST Housing(樂屋)
Transitional Housing Project at Choi Hing Road, Choi Hung for Lok Sin Tong Benevolent Society
Project information
601 units of residential flats in 2 no. of 4-storey high residential blocks with ancillary facilities areas at G/F and 1 -storey Ancillary Facilities blocks. Steel system will be adopted.
Client
Lok Sin Tong Benevolent Society
Start/Completion
2024

Nam Cheong 220 (南昌 220)
Consulting Service for New Social Housing for The Hong Kong Council of Social Service (HKCSS) at Nos. 220-222 Nam Cheong Street, Sham Shui Po
Project information
The Site of the Works is located at Kowloon Inland Lot No. 11128.
The Works comprises the construction of a 20-storeys (8/F-29/F) youth hostel block with 579 nos. hostel units on 7 storeys podium (G/F-7/F) plus a transfer plate. Steel MIC system will be adopted.
Client
The Hong Kong Council of Social Service (HKCSS)
Start/Completion
2020

T-Loft@Lau Fau (流浮‧東寓)
Transitional Housing at Various Lots in D.D.128 and D.D. 129 and Adjoining Government Land, Lau Fau Shan, Yuen Long
Project information
1,233 nos. of transitional residential housing units with 3 nos. of 4 or 5-storey residential blocks with Modular Integrated Construction (MiC) method and 1 no. of 1-storey block for Activity Hall Block . Steel system will be adopted.
Client
Tung Wah Group of Hospitals
Start/Completion
2025


Pok Oi Sing Ping Village (博愛昇平村)
Transitional Housing Project at Government Land in D.D. 82 in Ping Che, Ta Kwu Ling for Pok Oi Hospital
Project information
601 units of residential flats in 2 no. of 4-storey high residential blocks with ancillary facilities areas at G/F and 1 -storey Ancillary Facilities blocks. Steel system will be adopted.
Client
Pok Oi Hospital
Start/Completion
2024


CONCORDIA Tsat Sing Kong (路德會七星薈)
Temporary Transitional Housing and Hobby Farm Project at Tsat Sing Kong, Yuen Long
Project information
14 nos. of 4-storeys domestic blocks, providing 900 transitional housing units including management office and ancillary facilities premises; a hobby farm of about 8,000m2 for residents and public and 2 nos. sewage treatment plant at Tsat Sing Kong, Yuen Long. Steel system will be adopted.
Client
The Lutheran Church – Hong Kong Synod Limited
Start/Completion
2024


Po Ting Terraced Home(寶庭居)
Transitional Housing Project at Po Lam Road North, Tseung Kwan O for Christian Family Service Centre
Project information
385 units of residential flats in 2 nos. of 4-storey high residential block. RC MIC system will be adopted.
Client
Christian Family Service Centre
Start/Completion
2023


Lok Sin Village (樂善村)
Transitional Housing Project at Wong Yue Tan, Tai Po for The Lok Sin Tong Benevolent Society, Kowloon Various Lots in Demarcation District No. 26
Project information
1,236 units of residential flats with around 11 nos. of 3 to 4-storey buildings. 5 nos. of Ancillary building. Steel MIC system will be adopted.
Client
The Lok Sin Tong Benevolent Society
Start/Completion
2024


United Court(同心村)
Transitional Housing Project at Tung Tau, Yuen Long, Hong Kong
Project information
The first project for Hong Kong Sheng Kung Hui Welfare Council Limited. Total more than 1800 units of residential flats in 22nos. of 4-storey high residential block. Steel MIC system will be adopted.
Client
Hong Kong Sheng Kung Hui Welfare Council Limited
Start/Completion
2022

Transitional Housing Project at Luen Yan Street (荃福居)
Transitional Housing Project at Luen Yan Street, Tsuen Wan for Food for Good
Project information
196 units of residential flats in 1 no. of 4-storey high residential block and Steel MIC system will be adopted.
The Ancillary Facilities Block generally comprise reinforced concrete columns, beams, load bearing walls and suspended slabs of conventional construction.
Client
Food for Good
Start/Completion
2023


Pok Oi Kong Ha Wai Village (博愛江夏圍村)
Transitional Housing at Various Lots and Adjoining Government Land in DD105 at Kong Ha Wai, Kam Tin, New Territories for Pok Oi Hospital
Project information
More than 2000 units of residential flats in 8nos. of 4-storey high residential block. Steel MIC system will be adopted.
Client
Pok Oi Hospital
Start/Completion
2022

Yip Shing 6 (業成6號)
Modular Social Housing at 5-7 Yip Shing Street, Kwai Chung, NT
Project information
Around 110 units of residential flats in 1 no. of 4-storey high residential block. Steel MIC system will be adopted.
Client
The Hong Kong Council of Social Service (HKCSS)
Start/Completion
2022

The Lok Sin Tong Modular Social Housing Scheme at Junction of Sung Wong Toi Road and To Kwa Wan Road (樂屋)
Lok Sin Tong Modular Social Housing Scheme – Junction of Sung Wong Toi Road and To Kwa Wan Road Project
Project information
The first project for Lok Sin Tong Modular Social Housing Project
The Second HK Transitional Housing Development
3-storey of residential building with 108 NOS. of MiC modulars Steel MIC system will be adopted.
Client
The Lok Sin Tong Benevolent Society, Kowloon
Start/Completion
2021

Wellness Lodge (普綠軒)
Transitional Housing at 115 Castle Peak Road, Tsing Lung Tau, at Lot 97 in D.D. 388 Building
Project information
one 3-storeys Residential Building formed of Steel MIC and other 1-2 storeys Facility Buildings formed of In-situ RC structure. The building blocks are constructed on the Existing RC decking at G/F of a demolished building structure.
Client
Pumen Foundation Limited
Start/Completion
2023